目次
1总则 1
2术语 2
3基本规定 3
4工程承发包BIM技术要求 4
4.1一般规定 4
4.2设计阶段承发包BIM技术要求 5
4.3施工阶段承发包BIM技术要求 6
5工程承发包BIM技术成果文件 9
5.1设计阶段承发包BIM技术成果文件 9
5.2施工阶段承发包BIM技术成果文件 11
附录A建筑信息模型深度等级表 13
附录B市政工程模型深度等级表 25
本标准用词说明 38
引用标准名录 39
附:条文说明. 41
Contents
1GeneralProvisions 1
2Terms 2
3BasicRequirements 3
4BIMTechnicalRequirementsforProjectContracting 4
4.1GeneralProvisions 4
4.2BIMTechnicalRequirementsforContractinTheDesignPhase···5
4.3BIMTechnicalRequirementsofTheConstructionContract···········6
5BIMTechnicalAchievementDocumentofProjectContract···9
5.1BIMTechnicalAchievementDocumentContractedatTheDesign
Stage·······································································································9
5.2BIMTechnicalAchievementDocumentContractedatThe
ConstructionStage···············································································11
AppendixABuildingInformationModelDepthRating
Table···········································································13
AppendixBMunicipalEngineeringModelDepthRating
Table 25
ExplanationofWordinginThisStardard 38
ListofQuotedStandards 39
Addition:ExplanationofProvisions 41
1
1总则
1.0.1为贯彻执行国家建筑信息化发展政策,推动河北省建筑行业信息化实施,规范和引导房屋建筑与市政基础设施工程承发包过程中建筑信息模型技术的应用,制定本标准。
1.0.2本标准适用于房屋建筑与市政基础设施工程工程总承包项目承发包过程中建筑信息模型的建立及应用。
1.0.3房屋建筑与市政基础设施工程承发包过程中建筑信息模型技
术应用除应符合本标准的规定外,尚应符合国家及河北省现行有关
标准、规范和规程的规定。
2
2术语
2.0.1建筑信息模型buildinginformationmodeling(BIM)
是指通过数字信息仿真模拟建筑物所具有的真实信息,在建设工程及设施全生命期内,对其物理和功能特性进行数字化表达,并应用于设计、施工和运营管理等的全过程。
本标准中“建筑信息模型”“模型”“BIM”用词均指建筑信息模型。
2.0.2几何信息geometricinformation
表示建筑物或构件的空间位置及自身