五菱路(解放路-井冈山路)新建工程

编制:

审核:

审定:

编制单位:华北建筑有限公司

二0一五年十二月二日

目录

1、工程总体概述····················································3

1、1工程概述······················································3

1、2工程概况······················································3

1、3方案编制依据···················································3

2、桥位处地质状况及工程特点·········································4

2、1桥位处地质概况················································4

2、2工程特点·······················································5

3、基坑开挖方案得拟定···············································6

3、1基坑开挖方案得拟定············································6

3、2基坑开挖预备方案···············································6

4、施工部署··························································6

4、1基坑开挖放坡依据··············································6

4、2基坑开挖断面图················································7

4、3基坑开挖顺序··················································9

4、4施工方法及施工要点············································9

4、5机械设备配置·················································10

4、6技术准备·····················································11

4、7基坑放样·····················································11

4、8基坑开挖·····················································11

4、9基坑开挖弃土处理··············································12

5、基坑开挖组织施工·················································12

6、工程质量保证措施·················································12

6、1质量目标······················································12

6、2质量保证措施··················································13

6、3质量检验评定标准及检验方法····································13

7、安全生产保证措施·················································14

7、1安全生产目标··················································14

7、2安全生产保证体系··············································14

7、3安全管理措施··················································14

7、4安全操作措施························