二次结构工程;第一节Section1墙体砌筑;5/67;6/67;3.内墙砌块施工:砌筑时必须从转角处和纵横墙交接处向两边同时组砌,砌块相互咬槎搭接,搭
接长度不得小于砌块长度的90mm。
Masonrymustbefromthecornerandtheverticalandhorizontalwalljunctiontobothsidesatthesametime,ensureeachblockoverlapeachotheratnotmorethan90mm.;8/67;构造柱处马牙搓留设形式
ColumnReserveMethod;10/67;11/67;砌体中预留线盒留设考虑了与以后抹灰层相平且固实
Masonryreservedforjunctionboxwithconsiderationafterplasteringlayer;重点部位控制
ControlMeasure;墙体检测
WallMasonryInspection;第二节;;;做灰饼
MortarPiece;灰饼吊垂直
VerticalAlignment;抹灰
Plastering;平整
Leveling;门洞口抹灰
DoorPenetrationPlastering;墙体检测
WallMasonryInspection;24/67;内墙涂料施工
InteriorWallPainting;26/67;27/67;内墙墙砖施工
InteriorWallTileWorks;;6.墙砖的施工:用水泥胶液在墙上刮一层,同时在墙砖背面也刮上一层,然后立即将墙砖敲打入
浆层中,不要等浆料结皮后才粘结。2~4小时之内,应用靠尺检查平整度和垂直度,并用灰匙将缝拨直。
WallTileconstruction:ScrapalayerofCementglueonthewall,atthesametimebackofthetile,andthenimmediatelyknockedintothewallinpulp,dontwaitforslurrycrustbonded.Applicationof2~4hours,feetcheckflatnessandverticality,andspoondirectlining.;;刮白水泥
Applywhitemortar;33/67;开关处墙砖铺贴及检测
Tileworksforswitchesareaandinspection;第三节;36/67;37/67;38/67;外墙涂料施工
ExteriorWallPaintingWork;外墙贴砖
ExteriorWallTileWork;外挂墙板施工
ExteriorWallPanelWork;;43/67;44/67;45/67;46/67;第四节;48/67;49/67;50/67;2.环氧地坪地面施工:环境温度为25℃时,施工后2-3天应达到实干,即硬度达到完成固化的80%
左右。表面不能出现发粘现象。气泡:平涂型、砂浆型无气泡,自流平允许1个小气泡/10平方米。流平性好,无镘刀痕,大面积接口处基本平整;无浮色发花,颜色均匀一致,大面积接口处允许有极不明显的色差。无粗杂质,但允许有空气中的浮尘掉落在造成的极小缺陷。地坪表面应平整平滑,光泽度应达到设计要求(高光泽≥90、有光≥70、半光50-70),平??型为有光、水性为半光或光。
Constructionofepoxyflooring:theenvironmenttemperatureis25℃,2-3daysafterconstructionshouldbehardwork,namelythehardnessreachesabout80%completecuring.Surfacecannotbestickyphenomenon.Bubble:flattype,mortartypebubblefree,selflevelingallows1/10squaremetersofsmallbubbles.Goodleveling,notrowelmark,alargeareaofinterfaceofbasiclevel;nofloating,uniformcol