目录
第1章:施工组织设计编制依据···················〔1〕
1.1质量检验评定标准······················〔1〕
1.2国家及地区相关施工及验收标准················〔1〕
1.3施工组织设计编制原那么····················〔1〕
第2章:工程概况·························〔1〕
2.1工程简介··························〔3〕
2.2施工范围························〔3〕
第3章:施工组织及总体布署····················〔4〕
3.1施工组织及结构·······················〔4〕
3.1.1工程管理模式·····················〔5〕
3.1.2工程部指挥及协调运作·················〔5〕
3.2总体目标··························〔6〕
3.2.1质量目标·······················〔6〕
3.2.2平安目标·······················〔6〕
3.2.3工期目标·······················〔6〕
3.2.4环境目标·······················〔6〕
3.3总体施工组织························〔6〕
3.3.1施进度程安排·····················〔6〕
3.3.2总工期控制方法····················〔6〕
3.4施工协调··························〔7〕
3.5施工准备、人力资源·····················〔7〕
3.4.1技术准备·······················〔7〕
3.4.2现场施工准备·····················〔7〕
施工工序安排·····················〔7〕
需建设单位支持、配合施工问题·············〔8〕
第4章:施工总平面规划······················〔10〕
4.1临时工程的施工安排····················〔10〕
4.1.1临时驻地、临时设施··················〔10〕
4.1.2施工用电·······················〔10〕
4.1.3施工用水·······················〔11〕
4.1.4施工通讯·······················〔11〕
第5章:主要施工方法·······················〔12〕
5.1施工准备··························〔12〕
5.1.1技术准备·······················〔12〕5.1.2现场准备工作·····················〔12〕
5.1.3人员组织······················〔12〕
5.1.4材料组织·······················〔12〕
5.2施工方案··························〔13〕
5.2.1绿化种植工程·····················〔13〕
5.2.2场地平整、开挖、浇筑、安砌及硬质铺装工程········〔18〕
5.2.3给水管道安装·····················〔23〕
5.2.4排水管道安装·····················〔25〕
5.2.5电气工程安装·····················〔25〕
5.2.6绿化养护措施·····················〔28〕
第6章:施工保证措施·······················〔32〕
6.1工程工期保证措施·····················〔32〕
6.1.1工期保证实施原那么···················〔32〕
6.1.2工期保证实施措施···················〔32〕
6.1.3确保控制工程按期完成的措施··············〔32〕
6.2组织保证措施···················